About this Abstract |
| Meeting |
2027 TMS Annual Meeting & Exhibition
|
| Symposium
|
From Mine to Refinery: An EPD Symposium Honoring Shijie Wang
|
| Presentation Title |
A Dual-Domain Recovery Model (DDRM) for Predicting Gold Recovery in Heap Leaching Operations |
| Author(s) |
Guosheng Zhan, Jason Keller, Michael Milczarek |
| On-Site Speaker (Planned) |
Guosheng Zhan |
| Abstract Scope |
An empirical metal recovery model that accounts for metal dissolution and transport in two domains is utilized in this study. The domains are defined as regions of the leach pad with different reaction kinetics and transport properties: a “fast” domain and a “slow” domain. The fast domain is the fraction of the ore that readily releases gold to the leaching solution, and the slow domain releases gold more slowly. Several methods can be used to estimate model parameters. In this study, the model parameters are determined by calibrating the model to actual data from a leaching operation. The model application to a gold mine indicates that the Dual-Domain Recovery Model (DDRM) can be used as a relatively simple and reliable operational tool to provide information for the management of ore inventories and solution requirements in active heap leach facilities and to project future ounce production with high confidence. |
| Proceedings Inclusion? |
Planned: |