| Author(s) |
Louyan Shen, Wei Zeng, Sihai Luo, Jianjing Lu, Hui Jiang, Song Jiang, Shunling Ruan, Lingyun Huang, Chao Zhang, Yulin Zeng |
| Abstract Scope |
Tailings reservoirs are important mine structures with high potential energy and long service lives, and their stability affects mine production, downstream communities, and regional ecological security. China has more than ten thousand tailings reservoirs, many of which are upstream hydraulic-fill dams. Although the upstream method is simple, economical, and convenient, staged hydraulic deposition causes spatial variability in particle composition, permeability, consolidation, and seepage behavior, making phreatic-line control a key safety issue. This paper reviews the development of drainage reinforcement technologies for tailings dams in China in three stages: natural-material drainage, combined drainage with engineered materials, and mechanized drainage. Typical measures, including horizontal blind drains, drainage pipes, vertical wells, vertical-horizontal combined systems, arc-shaped floating drainage pipes, and other emerging facilities, are discussed. The evolution from manual to automated and intelligent monitoring is also summarized. Future research should emphasize coupled seepage-consolidation-stability analysis, long-term performance evaluation, monitoring-based warning, precise rehabilitation, and low-disturbance construction. |